Page 242 - Des Moines - Zoning, Planning and Design Ch 134, 135
P. 242

7. MeASUreMeNtS AND DeFiNitiONS                                                                   DRAFT

         Measurement of Building Type Requirements


         135-7.1  Measurement of Building type                  B.  courtyards. For some building types, courtyards
                    requirements                                   located along the facade in the build-to zone count
         The building type requirements outlined in the tables     towards the minimum coverage. Refer to building
                                                                   type requirements of 135-1.3 through 135-1.12.
         in 135-1.3 through 135-1.12 shall be measured and
         calculated consistent with the following standards:    7.1.2   BUilD-tO ZONe

         7.1.1   MiNiMUM PriMArY FrONtAGe Or FrONt              The build-to zone shall be calculated and measured as
         lOt liNe cOVerAGe                                      follows. Refer to Figure 7.1-B.
         The minimum percentage of building facade along the    A.  Measurement. If no additional pedestrian area is
         primary frontage of a lot is measured as follows:         required, the build-to zone is measured from the
                                                                   right-of-way line into the lot perpendicular to the
         A.  Measurement. The minimum primary frontage or          frontage.
            front lot line coverage shall, at a minimum, equal the
            width of the principal structures, as measured within   B.  Additional Pedestrian Area. When additional
            the build-to zone along the frontage edge, divided     pedestrian area is required per the building type
            by the length of the lot line parallel to the primary   notes, the build-to zone is measured from the edge
            street minus side setbacks. Refer to Figure 7.1-A.






                                                                      Type B Frontage    Type A Frontage
                                                                      Build-to Zone      Build-to Zone






         Type B Frontage             Side Setback
         Build-to Zone               Line                              BUILDING             BUILDING        Type A Frontage

                                              Rear               Type B Frontage
                                              Setback                                                         Type A
                                              Line                                                            Build-to
                                                                                                              Zone
                                                                                       Type A Frontage
                                                                Additional area required to
             Type B Frontage  BUILDING           Type A         Figure 7.1-B. Build-to Zones
                                                                meet minimum streetscape
                                                                width, if applicable





                    Type A Frontage              Build-to Zone                                      Maximum
                                                                              Parking               Impervious
                                                                                                    Coverage
                   Width of Building within Type                               Lot
                     A Frontage Build-to Zone                                                       Additional
                                                                                                    Semi-Pervious
                   Length Lot Line Parallel to the                                                  Coverage
                 Frontage minus Minimum Setbacks
                                                                   Street     BUILDING
              Width of Building within Build-to Zone  Type A                  Courtyard
             Length Lot Line Parallel to the Frontage   =   Frontage
                  minus Minimum Setbacks       Coverage
         Figure 7.1-A. Minimum Primary Frontage Coverage                    Street
                                                                Figure 7.1-C. Site Impervious and Semi-Pervious Coverage



         135-7-2                                                                          DRAFT AUGUST 3, 2017
   237   238   239   240   241   242   243   244   245   246   247