Page 126 - Des Moines - Zoning, Planning and Design Ch 134, 135
P. 126
135-1. BUilDiNG tYPeS DRAFT
Workshop/Warehouse
1.9.3 WOrKSHOP/WAreHOUSe reGUlAtiONS
eX I1, I2 NOTeS/ReFeReNCeS
A. Building Siting Refer to Figure 1.9-B
q Multiple Principal Buildings Permitted Permitted See Note 1 for double frontage lots
adjacent to N districts.
Minimum Primary Frontage
e Coverage not required not required
r Primary Frontage Setback (ft) 15 setback 25 setback Minimum pedestrian area is required per
Note 2.
Non-Primary Frontage Build-to See 135-7.1.2 for measurement
t Zone/ Setback (ft) 0-15 build-to zone 25 setback information.
Minimum Interior Side Setback 0; 10 adjacent to different
y (ft) district 0; 25 abutting N district See 135-5.10 for landscape buffer.
u Minimum Rear Setback (ft) 15 except 0 at alley 20 except 5 at alley See Note 1 for double frontage lots
adjacent to N districts.
Maximum Impervious Area 85% 65% See 135-7.1.5 for measurement
i Additional Semi-Pervious Area 15% 15% information.
o Surface Parking/Loading Rear yard, interior side yard Rear yard, interior side yard See 135-2.3.8 for additional garage door
Location
rear and interior side facades
Garage/Loading Entrance Rear and interior side facades only requirements on primary frontage facades.
Location only;
1) Permitted Driveway Access Alley unlimited; 1 per every 300 ft of primary and non-primary See 135-4.13 for additional driveway
frontage
regulations.
B. Height Refer to Figure 1.9-C
1! Minimum Overall Height 1 stories 1 stories See 135-7.1.6 for measurement
1@ Maximum Overall Height 3 stories 5 stories and 75 ft [in M1] information..
Primary Frontage Ground Story:
1# Minimum Height (ft) 15 10; 15 for single story
Maximum Height (ft) 20 none Story heights are measured floor to floor.
All Other Stories: See 135-7.1.6 for measurement
information.
1$ Minimum Height (ft) 9 9
Maximum Height (ft) 14 none
t y
rear lot line
u
non-primary street corner side lot line Building Footprint io interior side lot line
qi
front lot line 1) r
minimum
primary street pedestrian
area
e
Figure 1.9-B. Workshop/Warehouse: Building Siting
135-1-34 DRAFT AuGuST 3, 2017