Page 12 - Des Moines - Zoning, Planning and Design Ch 134, 135
P. 12

134-1. iNtrODUctOrY PrOViSiONS                                                                    DRAFT

         Transitional Provisions


         134-1.11  Transitional Provisions                      specified in 134-1.3.
         The provisions of this section address the transition
         to this zoning ordinance from the zoning ordinance in   134-1.12  Severability
         effect immediately before the effective date specified in   If one or more provisions of this ordinance, or the
         134-1.3.                                               application of this ordinance is held to be unlawful,
                                                                invalid, unenforceable, or preempted by applicable
         1.11.1  APPlicAtiONS, PerMitS AND APPrOVAlS            state or federal law or regulations, including Iowa Code
         A.  Any building, development or structure for which a   Chapter 8C and/or the Spectrum Act and similar FCC
            building permit was issued or a complete building   regulations, such provisions are deemed to be severed
            permit application had been accepted for processing   from this zoning ordinance. The remaining ordinance
            before the effective date specified in 134-1.3 may   provisions remain in full force and effect.
            be completed in conformance with the issued
            building permit and other applicable permits and
            conditions, even if such building, development or
            structure does not comply with provisions of this
            zoning ordinance. If the building, development or
            structure is commenced but not completed within
            the time allowed under the original building permit
            and any authorized permit extension, the building,
            development or structure may be constructed,
            completed and occupied only if it complies with the
            regulations of this zoning ordinance.
         B.  Complete applications for variances, exceptions,
            special permits, conditional uses, site plans, PUDs,
            and other zoning-related approvals that are pending
            approval on the effective date specified in 134-1.3
            must be reviewed wholly under the terms of the
            zoning ordinance in effect immediately preceding
            the effective date specified in 134-1.3.
         c.  The community development director is authorized
            to issue permits for construction or development
            approved before the effective date specified in
            134-1.3 and for developments pending approval
            before that effective date even if such building,
            development or structure does not fully comply
            with provisions of this zoning ordinance. If building
            is not commenced and completed within the time
            allowed under the permit and any authorized
            permit extension, then the building, development
            or structure may be constructed, completed and
            occupied only if it complies with the regulations of
            this zoning ordinance.

         1.11.2  ViOlAtiONS
         The adoption of this zoning ordinance does not affect
         any pending or future suit, proceeding or prosecution
         of, or action to abate, violations of the previous zoning
         ordinance that occurred before the effective date


             require that all annexed land be brought in as A-1. The
             existing provisions addressing nonconforming single-fam-
             ily dwellings will be moved to the “nonconformities” article
             of the ordinance


         134-1-4                                                                          DRAFT AUgUST 3, 2017
   7   8   9   10   11   12   13   14   15   16   17